Project lead generates the sheet in Spectator → they will provide you with a PDF.
Complete the required drawing checklist.
PDF is linked in Revit based on the BOD schedule criteria also established by your project lead.
Projects typically have one titlesheet per building.
The production team places a copy of the PDF in the DM BIM.4 Import Links folder.
Link the PDF at 600 DPI in the background.
Ensure that the titleblock parameters match the project information that was filled out by your project lead.