The Construction Assemblies Schedules are Spectator sheets: the schedules are built in Spectator and placed as linked schedules in Revit.
Assembly schedules are complete from PCD 50% / Pricing Package onward (see A - Architectural Drawings › Pricing Package): every assembly used in the model has a row, and every column is filled, with no "<varies>" or blank cells. A header-only or partly filled schedule counts as missing, not present.
Schedules Specific to Project Types:
LP - Construction Assemblies
This is for a Launchpad location built as a hybrid wood & precast concrete building.