  • When completing a set for townhomes; it is expected that each 'Building' has it's own set.
  • When moving from a Pricing set to an IFC set, you are really only adding the following:
  • Foundations
  • Enlarged Plans
  • Enlarged Sections
  • Contextual Plan Details
  • Contextual Section Details


DP - Sheet List Matrix

Sheet Number
Sheet Name
A001-1
Titlesheet
A001-2
Revision Schedule
A002-1
Sheet List
A003
Legend Sheet
A005-1
Building Code Review
A008-1
Architecture Specification Schedules
A101
Context Plan
A102
Site Plan
A110
Driving Range Plan
A221
Key Construction Plan - Level 01 & Level 02
A222-1
Construction Plan - Level 01, Part 1
A222-2
Construction Plan - Level 01, Part 2
A222-3
Construction Plan - Level 01, Part 3
A222-4
Construction Plan - Level 02, Part 1
A222-5
Construction Plan - Level 02, Part 2
A222-6
Construction Plan - Level 02, Part 3
A223-1
Enlarged Construction Plans, Stair A
A223-2
Enlarged Construction Plans, Stair B
A223-3
Enlarged Construction Plans, Stair C
A223-4
Enlarged Construction Plans, Stair C
A231
Key Roof Plan
A232-1
Roof Plan, Part 1
A232-2
Roof Plan, Part 2
A232-3
Roof Plan, Part 3
A251
Key RCP - Level 01 & Level 02
A252-1
RCP - Level 01, Part 1
A252-2
RCP - Level 01, Part 2
A252-3
RCP - Level 01, Part 3
A252-4
RCP - Level 02, Part 1
A252-5
RCP - Level 02, Part 2
A252-6
RCP - Level 02, Part 3
A261
Key Floor Finish Plan - Level 01 & Level 02
A262-1
Floor Finish Plan - Level 01, Part 1
A262-2
Floor Finish Plan - Level 01, Part 2
A262-3
Floor Finish Plan - Level 01, Part 3
A262-4
Floor Finish Plan - Level 02, Part 1
A262-5
Floor Finish Plan - Level 02, Part 2
A262-6
Floor Finish Plan - Level 02, Part 3
A271
Key FF&E Plan - Level 01 & Level 02
A272-1
FF&E Plan - Level 01, Part 1
A272-2
FF&E Plan - Level 01, Part 2
A272-3
FF&E Plan - Level 01, Part 3
A272-4
FF&E Plan - Level 02, Part 1
A272-5
FF&E Plan - Level 02, Part 2
A272-6
FF&E Plan - Level 02, Part 3
A301
Key Building Sections
A302
Building Sections
A303
Building Sections
A304
Building Sections
A31#
Enlarged Building Sections
A411
Key Building Elevations
A412
Key Building Elevations
A413
Key Coloured Building Elevations
A414
Key Coloured Building Elevations
A415-#
Building Elevations
A421
Curtain Wall Elevations
A503-1
SD - Punch Window InstallInstructions In Wood
A503-3
SD - Membrane Penetration Details
A503-4
SD - Not-Rated Construction Details
A504-4
SD ST - Firestopping Details
A5##
Signage Details - Wordmark
A5##
Signage Details - 20' Wall Logo
A6##
Plan Details
A7##
Section Details
A8##
Interior Elevations
Interior Elevations - Universal Washrooms
Interior Elevations - Lobby / Vestibule / Stair C
Interior Elevations - Washrooms
Interior Elevations - Corridors
Interior Elevations - Staff Room
Interior Elevations - Bar & Lounges
Interior Elevations - Mezzanine
Interior Elevations - Office





Workflow


gitGraph
branch CDOC
checkout CDOC
commit id: "1. PCD 50%"
commit id: "2. PCD 70%"
commit id: "3. PCD 90%"
commit id: "4. IFC"


PCD 90%

Contextual Details

You are in the PCD 90% drawing phase - make sure you have completed all of the other architectural drawings in your set before proceeding to the contextual details.
You will be setting up your  ⁠⁠A600 - Plan Details⁠  and  ⁠⁠A700 - Section Details⁠  you can see specifics for each of those sheets in the sheet standards. This guide covers how to set up and complete the details in Revit.
    Open your Architectural Revit model after confirming you good to go for documenting.
    Check that you have Symbol (Generic Annotation) called:DM-Annotation_Note_Schedule. Insert if from Content Catalog if you don’t.
    Check that you have the linestyles for WRB and VB.
    The following annotation is to be done per view and does not grouped in any way:
    Draw the line of the Weather Resistive Barrier
    Draw the line of the Vapour Retarder
    Place the Notation Symbol directly on the details to reference the items visible in the detail.
    Tag the following items
    Construction Assemblies: Wall Tags, Floor Tags, Ceiling Tags, Roof Tags & Roof Soffit Tags
    Window Tags
    Door Tags
    Note any of the following in DM_Text_Subtitle
    Exterior, Interior, Attic, Crawlspace
    Balcony, Patio or Terrace
    Venting / Air Flow Path for Soffits / Roofs or Attics
    Note any of the following in DM_Text
    Building Code References
    Specific Notes
    Coordination Elements, ie Steel Beam. Refer to Structural, Exhaust Vent. Refer to Mechanical